Stand-alone installation tests
............................................................................................................................................................................................................................................................
Section and chapter
Notes:
1. Only required if equipped.
............................................................................................................................................................................................................................................................
II - 6
Procedure
"OC-192 low-speed testing" (p. 6-36)
"Office alarm test" (p. 6-41)
"Automatic protection switching and alarm
test" (p. 6-45)
"Manual switching tests" (p. 6-49)
"External timing verification" (p. 6-52)
"Miscellaneous (environmental) discrete
telemetry test" (p. 6-55)
"Modem connection test" (p. 6-59)
"Final operations" (p. 6-61)
Completed
Required
Yes
No
Yes
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
Yes
Alcatel-Lucent 1665 DMXtend R10.0
365-372-327R10.0 Issue 1
January 2013