Battery Health Check Completed; Battery Capacity Test Is Overdue; Battery Charging Started - 3Ware 9550SXU-12 User Manual

Sas/sata raid software raid controllers
Table of Contents

Advertisement

Troubleshooting

0052 Battery health check completed

0053 Battery capacity test is overdue

0055 Battery charging started

296
Event Type
Information
Cause
The Battery Backup Unit evaluates periodically the health of the battery and
its ability to backup the 3ware RAID controller in case of a power failure.
This message is posted to the host when this health check has completed.
Event Type
Information
Cause
There has not been a battery capacity test run in the last 6 months, which is the
maximum recommended interval. This message will be sent once every week
until the test is run.
Action
AMCC recommends running the test at least once every 6 months, if the
measured battery capacity is longer than 120 hours. If the measured battery
capacity is less than 120 hours the recommended test interval is 4 weeks.
Event Type
Information
Cause
The Battery Backup Unit has started a battery charge cycle.
Action
None required
3ware SAS/SATA RAID Software User Guide, Version 9.5.1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9690sa3ware 9650se

Table of Contents