Selecting Advanced Or Basic Verify Schedules; Removing A Task Slot From A Schedule - 3Ware 9550SXU-12 User Manual

Sas/sata raid software raid controllers
Table of Contents

Advertisement

Maintaining Units

Selecting Advanced or Basic Verify Schedules

Removing a Task Slot from a Schedule

176
2
In the Schedule Rebuild Tasks section, select the appropriate setting:
Follow Schedule
or
The illustration below shows this setting for the rebuild task schedule.
Note:
Self-test schedules cannot be turned off in this way. To disable self-tests you
must either remove all schedule times, or uncheck the tests listed in the Tasks
column. For more information, see "Selecting Self-tests to be Performed" on
.
page 178
You cannot ignore a verify schedule. You can only select either Basic or
Advanced as the verify schedule.
The Basic verify schedule is selected by default and is scheduled to run once a
week at Friday 12 am. You can change the time at which it runs on the
Schedule page in 3DM or on the Policy screen in 3BM.
The Advanced verify schedule is similar to the Rebuild/Migrate schedule and
has seven scheduling slots. For details about the functioning of Basic and
Advanced verify schedules, see "Using Auto Verification" on page 164.
To select Basic or Advanced verify schedule
1
Choose
Management > Schedule
The Scheduling page appears, showing the schedule for Rebuild/Migrate
Tasks.
2
From the drop-down menu, select
The Schedule Verify Tasks page appears.
3
Select either
Basic
By default, seven daily task schedule slots are defined, each starting at 12:00
am and running for 24 hours.
A maximum of seven schedule slots can be defined. When seven schedule
slots are shown for any of the tasks, you must remove a schedule slot before
you can add another.
3ware SAS/SATA RAID Software User Guide, Version 9.5.1
Ignore Schedule
.
from the menu bar.
Verify Tasks
or
as the verify schedule.
Advanced
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9690sa3ware 9650se

Table of Contents