3Ware 9550SXU-12 User Manual page 178

Sas/sata raid software raid controllers
Table of Contents

Advertisement

Maintaining Units
166
To verify a unit through 3DM
1
In 3DM, choose
Management > Maintenance
2
In the
Unit Maintenance
you want to verify and click
3DM puts the selected unit in verifying mode.
If Basic Verify is selected on the Scheduling page, the verification process
begins almost immediately. If Advanced Verify is selected, the unit will
not start actively verifying until the next scheduled time.
A
Stop Verify
link appears next to the unit on the Maintenance page. If
you need to stop the verify process, use this link. (If initialization starts
because the unit had not previously been initialized, it cannot be halted, so
no
link appears.)
Stop Verify
To verify a unit through 3BM
1
At the main 3BM screen, select the unit by highlighting it and pressing
Enter.
An asterisk appears in the left-most column to indicate that it is selected.
2
to the
Tab
Maintain Unit
3
On the pop-up menu, select
Verification of the selected unit starts immediately.
Figure 66. Verifying a Unit
3ware SAS/SATA RAID Software User Guide, Version 9.5.1
.
section of the Maintenance page, select the unit
Verify Unit
.
button and press
.
Enter
and press
Verify
Enter
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9690sa3ware 9650se

Table of Contents