Turning On or Off Use of a Rebuild/Migrate Task
Schedule
www.3ware.com
Figure 72. Selecting Task Schedules to View
Turning on the schedule for Rebuild/Migrate tasks forces initializations,
rebuilds and migrates to be performed only during the time specified by the
schedule. If the schedule is not turned on, rebuilds, migration, and
initialization can happen whenever they are required or are manually started.
There may be times when you want to disable scheduled rebuild/migrate
tasks, so that you can rebuild or migrate a unit right away, without waiting for
the next scheduled time. In this case, you can disable the schedule, as
described below.
Note:
When you first use 3DM, daily schedules exist with 24 hour duration—that is,
the schedule is for "all the time." Until you change these 24-hour daily schedule,
enabling the schedule will not have any direct effect.
You can easily disable a current Rebuild/Migrate schedule without deleting
the schedule itself.
To turn on or off use of the current Migrate/Rebuild task schedule
1
Choose
Management > Schedule
The Scheduling page appears, showing the schedule for Rebuild/Migrate
Tasks.
Scheduling Background Tasks
from the menu bar.
175

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9690sa3ware 9650se

Table of Contents