Mitsubishi Eclipse 1990 Service Manual page 328

Table of Contents

Advertisement

ENGINE OVERHAUL
(3) Push in the rod little by little with the
hole A in the rod is
(4)
holes.
Unclamp the auto tensioner
(6) Install the auto tensioner to front case
the specified torque.
Caution
Leave the wire
TENSIONER PULLEY INSTALLATION
Install the tensioner pulley in such
holes are arranged vertically.
(1) Check that the timing belt tensioner and have been,
installed in position. (See
(2) Align timing mark on camshaft sprocket with timing mark
on cylinder head.
(3) Align timing mark on crankshaft sprocket with timing mark
on front case.
TSB Revision
a wire
mm'
TIMING BELT INSTALLATION
Belt
until the set
the hole
in
cylinder.
in.)
the set
vise.
,
tighten to
,
the
that its
. . .
small

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents