ENGINE AND EMISSION CONTROL
Engine>
and Post-installation Operation
Splash Shield (R.H.) Removal and installation (Re-
fer to GROUP 42
Fender)
Removal steps
1. Evaporative emission
2. Vent hose
3. Vent hose
4. Connector
5. Vent hose
6. Vapor hose
7. Connector
8. Evaporative emission purge hose
9. Vapor hose
TSB Revision
Engine (Turbo) and
Engine>
3
I
10. Vent hose
Filter
11.
bracket
12. Air filter
13. Evaporative emission canister up-
per
bracket
14. Evaporative
15.
emission