TOHATSU 40 Service Manual page 280

2 stroke
Hide thumbs Also See for 40:
Table of Contents

Advertisement

1. Slide starter motor into bracket (4), apply threadlocker to
60
bolt threads, and install mounting bolts.
2. Install starter motor band (3) apply threadlocker to bolt
60
threads, and starter motor band bolts.
3. Connect starter solenoid cable (1) and ground cable (2).
60
4. Coat terminals with battery spray protector.
Starter Solenoid Test
1. Disconnect terminals (4) and (5) and disconnect terminal
61
(3) from chassis ground.
2. Set analog multimeter for continuity. Check for continuity
between terminals:
(3) and (5). If meter does not show continuity, replace starter
61
solenoid (1).
(5) and clean chassis ground. If meter shows continuity,
61
replace starter solenoid.
(3) and clean chassis ground. If meter shows continuity,
61
replace starter solenoid.
3. Disconnect positive battery lead (8) and RED starter
61
switch lead (9) from starter terminal (2) and disconnect
starter motor lead (7) from starter terminal (6).
4. Check for continuity between terminals:
(2) and (6). If meter shows continuity, replace starter
61
solenoid.
(2) and clean chassis ground. If the meter shows continuity,
61
replace starter solenoid.
(6) and clean chassis ground. If the meter shows continuity,
61
replace starter solenoid.
3-/ 4-Cylinder
ELECTRICAL SYSTEM
T1516
T1545
7-101

Advertisement

Table of Contents
loading

This manual is also suitable for:

5060708090115 ... Show all

Table of Contents

Save PDF