SECTION 7
Test 5 - CD Unit Output Test - Cranking RPM
Make sure all electrical terminals are connected
during this test except those that are noted in the
test procedure.
Check for continuity between chassis ground and
the ground connection for the magneto plate, CD
Unit, and ignition coils before conducting the
following procedure.
Reference the following electrical drawings for the
CD Unit Output Test - Cranking RPM:
- Figure 4 - models 40 / 50 / 60B / 70B / 60C / 70C /
22
80 / 90.
- Figure 5 - models 115 / 120 / 140.
23