GE LOGIQ E9 Service Manual page 642

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
Table 8-185 Capacitor Pack Installation
2.
Position the Pack at the top of the BEP.
Be sure the lip, on the underside of the
Pack, hooks on the edge of the Card Rack,
and the three tabs insert into the slots on
the top of the BEP frame. The lip "clamps"
the Card Rack and BEP (2) together. This
is a tight fit.
Lower the lower Column Cover.
Slide the Shear Wave Console Cover
Assembly (4) into the console.
Position the Main Console Front Cover to
engage the lower Column Cover stop tabs
(3).
Latch the two latches (1) that clamp the
Pack to the top of the BEP.
3.
Reinstall the Antennas on the top of the
BEP, if the Attunes were removed.
4.
Replace the covers.
5.
Perform Functional Checks. See:
8-11-9-4 - Verification
8 - 296
. 2
EV
Steps
and
8-11-9-5 "Functional Checks" on page
Section 8-11 - Peripherals replacement
Corresponding Graphic
8-11-9-3 - Calibration and
LOGIQ E9 S
ERVICE
adjustments,
8-297.
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents