GE LOGIQ E9 Service Manual page 450

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-6-3-1
LCD Arm replacement - R3.x and earlier (cont'd)
Table 8-66
1.
Carefully install the LCD Arm assembly into
position, first feeding the LCD Arm cables
down through the console opening.
Push the LCD Mount Lock handle (1) into
locked the position (shown LOCKED).
DO NOT adjust nut (2).
2.
Connect the LCD cables; video (P10) and
power (P3) from the connectors on the
Bulkhead. The Gel Warmer cable (P1)
does not have to be removed.
Install the Bulkhead Cover.
Install the LCD Monitor assembly.
3.
Perform Functional Checks. See:
and
8 - 104
. 2
EV
LCD Arm assembly installation
Steps
8-6-3-6 "Functional Checks" on page
Section 8-6 - Replacing Top Console Parts
Corresponding Graphic
LCD Mount Lock Handle
LCD Cables at Bulkhead
8-6-3-4 - Calibration and
8-117.
LOGIQ E9 S
ERVICE
adjustments,
8-6-3-5 - Verification
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents