Front Casters installation
1.) Position the Caster so it align with the fastening screw.
2.) Install the three fixing screws (M8 x 20 mm), torque: 20.5 Nm (15.1 lbf-ft).
3.) Remove the Wooden Wedge.
4.) Roll the system off the Bevel Edged Board.
5.) To replace the other Front Caster, repeat all the steps from
8-196,
system.
6.) Install the Foot Rest Cover.
8-8-3-6
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-8-3-7
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it starts as it should.
8-8-3-8
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required checks and is ready for use.
Table 8-119 Front Casters replacement Functional Checks
See:
Section
4-2-2
4-2-3
4-3-14
4-3-5
4-3-7-3
4-3-7-6
4-3-18
4-2-10-1
and
4-3-18-2
4-2-4
. 2
EV
but now using the Bevel Edged board and the Wooden Wedge on the other side of the
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
B-Mode Checks
Color Mode Checks
PW/CW Doppler Mode Checks
Mechanical Function Checks
The Casters (Wheels) control
and
Brakes and Direction Lock Checks
Top Console position adjustment
Chapter 8 Replacement procedures
LOGIQ E9 S
8-8-3-4 "Front Casters removal" on page
Debrief Script
LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required
checks and is ready for use.