GE LOGIQ E9 Service Manual page 512

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-6-12
Gel Warmer replacement
8-6-12-1
Manpower
One person, 15 minutes.
8-6-12-2
Tools
For tools needed, refer to:
8-6-12-3
Preparations
When preparing for the replacement, you must perform the following steps:
Energy Control and Power Lockout for LOGIQ E9
NOTICE
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO VOLTAGE
GREATER THAN 30 VOLTS:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
TAG
&
LOCKOUT
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AS THERE ARE NO
Signed
Date
TEST POINTS TO VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL ON/OFF BUTTON
WILL TURN OFF.
5. DISCONNECT THE EPS (EXTENDED POWER SHUTDOWN) BATTERY AT J3, OR THE
BATTERY FROM THE CHARGEBOARD AT PCN1 WHEN WORKING IN THE BEP. THIS SHOULD
BE DONE WHENEVER THE BEP IS OPEN AND THE EPS OR CHARGEBOARD IS EXPOSED AND
CHANGING PARTS.
Beware that the Main Power Supply, Extended Power Shutdown or ChargeBoard and BEP may be
energized even if the power is turned OFF if the cord is still plugged into the AC Outlet.
1.) Power down the system.
2.) Disconnect the mains power cable from the wall outlet.
Follow this link if you need more information:
4-2-3 "Power shut down" on page 4-7.
8 - 166
. 2
EV
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Section 8-6 - Replacing Top Console Parts
LOGIQ E9 S
M
ERVICE
ANUAL
8-5.

Advertisement

Table of Contents
loading

Table of Contents