8-6-4-2
V2 LCD Arm Assembly Adapter installation
Table 8-75
1.
Insert the Adapter into the Frame UI Upper
Assembly.
Align the mounting holes and install the two
M5 x 50 hex key screws using a 4 mm Hex
Key to secure the Adapter. Torque 2.5 Nm
(1.8 lbf-ft {21.6 lbf-in}).
NOTE: Note the shape of the rear
mounting hole, this is important for the
next step before the Thrust Plate is
installed.
2.
NOTE: MAKE SURE the rear mounting
hole for the Arm Neck Lock Pin, in the Trust
Plate is aligned with the rear mounting hole
of the Adapter BEFORE installing the
Plate. If the Plate is installed incorrectly, it
may be very difficult to remove.
Align the rear mounting hole for the Arm
Neck Lock Pin, in the Trust Plate with the
rear mounting hole of the Adapter.
Seat the Plate. The plate will be captured
by the two retaining pins that protrude from
the Adapter.
3.
Install the Ground Cable to the LCD
Adapter and to the Bulkhead using the two
screws and lock washers. Torque 1.3 Nm
(0.96 lbf-ft {11.5 lbf-in}).
4.
Re-install the LCD and Arm Assembly and connect the LCD Cable.
. 2
EV
V2 Arm Adapter installation
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
Corresponding Graphic
LCD Ground Cable installed
M
ERVICE
ANUAL
8 - 121