Cooling
The cooling requirement for the LOGIQ E9 scanner with LCD and onboard peripherals, is up to 4712
Btu/hr. This figure does not include cooling needed for lights, people, or other equipment in the room.
Each person in the room places an additional 300 Btu/hr demand on the cooling system.
2-2-1-4
Lighting
Bright light is needed for LOGIQ E9 installation, updates and repairs. However, operator and patient
comfort may be optimized if the room light is subdued and indirect. Therefore a combination lighting
system (dim/bright) is recommended. Keep in mind that lighting controls and dimmers can be a source
of EMI which could degrade image quality. These controls should be selected to minimize possible
interference.
2 - 2