GE LOGIQ E9 Service Manual page 422

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-5-18-6
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-5-18-7
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
8-5-18-8
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required checks and is ready for use.
See:
Section
4-2-2
4-2-3
4-3-14
4-3-5
4-3-7
4-3-18
4-3-18-2
8 - 76
. 2
EV
Table 8-49
Column Cover Assembly replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
B-Mode Checks
System CFM and PWD Checks
Mechanical Function Checks
Brakes and Direction Lock Checks
Operator I/O Movement - XY and Z
Mechanism
Section 8-5 - Replacing Covers and Bumpers
Debrief Script
LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all
required checks and is ready for use.
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents