GE LOGIQ E9 Service Manual page 468

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
Table 8-75
DO NOT connect the LCD power cable to the power (P3) connector on the Bulkhead when the
LOGIQ E9 is powered up. Damage to the LCD Power Cable and/or the Bulkhead Board can
occur. See: images below of damage that can occur.
5.
Install the Bulkhead Cover.
8-6-4-3
Calibration and adjustments
Refer to:
8-6-4-4
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws that you removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the LOGIQ E9 to verify that it operates as intended.
8 - 122
. 2
EV
V2 Arm Adapter installation
Steps
NOTICE
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
Section 6-3 "LCD Monitor adjustments" on page 6-2
Section 8-6 - Replacing Top Console Parts
LOGIQ E9 S
Corresponding Graphic
for LCD Monitor calibration instructions.
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents