GE LOGIQ E9 Service Manual page 461

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
Table 8-70
4.
Connect the LCD and Arm cables; Arm
ground Cable (A) first, Video (P10) and
power (P3) from the LCD.
The Video Cable has a retainer and screw.
Tighten the screw with a small, flat blade
screwdriver.
Make sure the cables do not interfere with
the installation of the cables. It may be
necessary to push the cables up before
installing the Bulkhead Cover.
DO NOT connect the LCD power cable to the power (P3) connector on the Bulkhead when the
LOGIQ E9 is powered up. Damage to the LCD Power Cable and/or the Bulkhead Board can
occur. See images below of damage that can occur.
5.
Re-install the LCD Monitor.
. 2
EV
LCD Monitor V2 Arm assembly installation - R5 and later
Steps
NOTICE
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
Chapter 8 Replacement procedures
LOGIQ E9 S
ERVICE
Corresponding Graphic
M
ANUAL
8 - 115

Advertisement

Table of Contents
loading

Table of Contents