Section 3 Network Turnup Procedure
1.
INTRODUCTION
This section discusses the ATLAS 550 System installation.
2.
TOOLS REQUIRED
The tools required for installation of the ATLAS 550 unit are:
•
#2 Phillips-head screwdriver
•
Flat-head screwdriver (for installing modules)
To prevent electrical shock, do not install equipment in a wet location or during a
lightning storm.
Electronic modules can be damaged by static electrical discharge. Before handling
modules, put on an antistatic discharge wrist strap to prevent damage to electronic
components. Place modules in antistatic packing material when transporting or storing.
When working on modules, always place them on an approved antistatic mat that is
electrically grounded.
3.
UNPACK AND INSPECT THE SYSTEM
The ATLAS 550 is shipped in its own cardboard shipping carton. Open the carton carefully and avoid deep
penetration into the carton with sharp objects.
After unpacking the unit, inspect it for possible shipping damage. If the equipment has been damaged in
transit, immediately file a claim with the carrier, and then contact ADTRAN Customer Service (see the
contact information in the front of this manual).
Contents of ADTRAN Shipments
Your ADTRAN shipment includes the following items. (Shipping contents for the modules begin on
page 57.)
•
The ATLAS 550 unit
•
The ATLAS 550 Product CD
•
AC power cord - ADTRAN P/N 3127031 (with AC systems)
•
19" rackmount brackets and screws
•
RJ-45 to DB-25 adapter - ADTRAN P/N 3196ADPT006
Customers must supply the Ethernet cable.
52
© 2004 ADTRAN, Inc.
ATLAS 550 System Manual
61200305L2-1B