5.2 Leak test the system

WARNING: GAS LEAKAGE
Risk of injury or damage to equipment. Leak test the system after installation and
seal any leaks found to prevent leakage of dangerous substances out of the system
and leakage of air into the system.
Note:
If more information on leak-testing is necessary, contact supplier or us.

5.3 Configure the system through a PDT

5.3.1 Pump display terminal

The PDT accessory provides pump on or off and status reporting. Warnings and alarms
are also indicated to the user. Up to two PDTs can be installed on the pump.

Figure 19 Pump display terminal

LEDs
Local Control: Illuminates green continuously when the PDT has control of the pump.
Pump On (in the Pump Start Button): Illuminates (green) to indicate that the pump is in
operation.
Warning: Illuminates yellow to indicate that a pump warning is present. It flashes when a
new warning occurs until it is acknowledged by pressing Enter. It then illuminates
continuously until the warning clears.
Alarm: Illuminates red to indicate that a pump alarm is present. It flashes when a new
alarm occurs until it is acknowledged by pressing Enter. It then illuminates continuously
until the alarm clears.