Edwards EH500 Instruction Manual
Hide thumbs Also See for EH500:
Table of Contents

Advertisement

Instruction Manual
EH Mechanical Booster Pumps
Description
Item Number
EH250 2.2kW Safe Area Pumps
A301-51-945, A301-52-946
EH250 1.5kW Safe Area Pumps
A301-51-935, A301-53-935, A301-52-936, A301-54-936
EH500 1.5kW Safe Area Pumps
A302-73-935, A302-74-936
EH500IND 2.2kW Safe Area Pumps
A302-71-945, A302-72-946
EH1200 3kW Safe Area Pumps
A305-92-935, A305-93-936
EH1200IND 3kW Safe Area Pumps
A305-90-935, A305-91-936
EH1200C 3 kW Flame Proof Pump
A305-56-982
EH1200 T3/T160/T4 3kW Flame Proof Pump
A305-57-900
EH2600 7.5kW Safe Area Pumps
A307-51-935, A307-53-935, A307-52-936, A307-54-936
EH2600IND 11kW Safe Area Pumps
A307-75-946, A307-76-982
EH2600C 11kW Flame Proof Pump
A307-56-982
EH2600 T160/T4 11kW Flame Proof Pump
A307-79-900
EH2600T3 11kW Flame Proof Pump
A307-41-935
EH4200 7.5kW Safe Area Pumps
A309-51-935, A309-53-935, A309-52-936
EH4200IND 11kW Safe Area Pumps
A309-75-946, A309-76-982
EH4200C 11kW Flame Proof Pump
A309-56-982
EH4200 T160/T4 11kW Flame Proof Pump
A309-79-900
EH4200T3 11kW Flame Proof Pump
A309-41-935
A301-51-880 Issue T
Contents
Section
1
Introduction ....................................................................................... 1
1.1
Scope and definitions ................................................................................................... 1
1.2
Description ................................................................................................................ 1
1.2.1
Overview .................................................................................................................. 1
1.2.2
General construction .................................................................................................... 5
1.2.3
Principle of operation ................................................................................................... 5
1.2.4
Hydrokinetic drive ....................................................................................................... 5
1.3
Chemical and ATEX compliant EH pumps ............................................................................ 5
1.3.1
Flameproof motors ...................................................................................................... 5
1.3.2
ATEX directive (94/9/EC): Europe only .............................................................................. 6
1.3.3
Temperature classification ............................................................................................. 6
1.3.4
Hydrokinetic drive/gearbox purge .................................................................................... 7
1.3.5
After-cooler ............................................................................................................... 7
1.3.6
Normal operation ........................................................................................................ 7
1.3.7
Abnormal operation ..................................................................................................... 8
1.3.8
Electrostatic charges .................................................................................................... 8
2
Technical Data .................................................................................... 9
2.1
Operating and storage conditions ..................................................................................... 9
2.2
Critical backing pressure ............................................................................................... 9
2.3
Performance .............................................................................................................12
2.4
Mechanical data .........................................................................................................12
2.5
Electrical data ........................................................................................................... 13
2.6
Lubrication data ........................................................................................................ 14
2.7
Hydrokinetic drive/gearbox nitrogen supply (EH1200C, EH1200 T3/T160/T4X, EH2600C, EH2600 T3X,
2.8
Cooling-water data .....................................................................................................14
2.9
Noise and vibration data ............................................................................................... 15
2.10
Connections ..............................................................................................................15
2.11
Materials of construction of components exposed to pumped gases ...........................................16
2.12
Item Numbers ........................................................................................................... 16
3
Installation ....................................................................................... 25
3.1
Safety ..................................................................................................................... 25
3.2
System requirements ................................................................................................... 25
3.3
Unpack and inspect .....................................................................................................26
3.4
Fill the pump with oil ..................................................................................................27
3.4.1
Hydrokinetic drive/gearbox ........................................................................................... 27
3.4.2
Shaft-seal reservoir ..................................................................................................... 27
3.4.3
Gear-cover (all EH1200, EH2600 and EH4200 model pumps only) ...............................................28
3.5
3.6
Electrical connections ..................................................................................................29
3.6.1
Electrical supply configuration ....................................................................................... 29
3.6.2
Motor connections ......................................................................................................30
3.6.3
3.7
Check the direction of pump rotation ............................................................................... 38
3.8
3.9
Connect the pump-inlet and outlet ..................................................................................40
3.10
External evacuation of hydrokinetic drive/gearbox (optional) ..................................................41
© Edwards Limited 2007. All rights reserved.
Edwards and the Edwards logo are trademarks of Edwards Limited.
A301-51-880
Issue T Original
Page
14
39
Page i
A301-51-880 Issue T
4
Operation ........................................................................................ 43
4.1
Operational safety ......................................................................................................43
4.2
Start-up procedure .....................................................................................................43
4.2.1
Pre-start checks ......................................................................................................... 43
4.2.2
Start-up ..................................................................................................................44
4.3
Shut-down ................................................................................................................44
5
Maintenance ..................................................................................... 45
5.1
Safety information ......................................................................................................45
5.2
Maintenance plan ....................................................................................................... 46
5.3
Check the oil-levels .................................................................................................... 46
5.4
Inspect the pump connections ........................................................................................ 46
5.5
Change the pump oil ................................................................................................... 47
5.6
Lubricate the rear-bearing (All EH250 and EH500 model pumps only) ......................................... 48
5.7
Overhaul the pump .....................................................................................................49
6
Storage and Disposal ........................................................................... 51
6.1
Storage ................................................................................................................... 51
6.2
Disposal ................................................................................................................... 51
7
Service and Spares .............................................................................. 53
7.1
Introduction .............................................................................................................53
7.2
Service .................................................................................................................... 53
7.3
Spares ..................................................................................................................... 53
Illustrations
Figure
1
All EH250 and EH500 pump variants .................................................................................. 3
2
All EH1200, EH2600 and EH4200 pump variants ..................................................................... 4
3
EH250/EH250IND dimensions (mm)* .................................................................................17
4
EH500/EH500IND dimensions (mm)* .................................................................................18
5
EH1200/EH1200IND dimensions (mm) ............................................................................... 19
6
EH1200C/EH1200 T3/T160/T4 dimensions (mm) ..................................................................20
7
EH2600/EH2600IND dimensions (mm) ............................................................................... 21
8
EH2600C/EH2600 T3/EH2600 T160/T4 dimensions (mm) ......................................................... 22
9
EH4200/EH4200IND dimensions (mm) ............................................................................... 23
10
EH4200C/EH4200 T3/EH4200 T160/T4 dimensions (mm) ......................................................... 24
11
Sight glasses .............................................................................................................28
12
Example control circuit ................................................................................................ 32
13
Electrical supply configuration A .....................................................................................34
14
Electrical supply configuration B .....................................................................................34
15
Electrical supply configuration C .....................................................................................35
16
Electrical supply configuration D .....................................................................................35
17
Electrical supply configuration E .....................................................................................36
18
Electrical supply configuration F .....................................................................................36
19
Electrical supply configuration G .....................................................................................37
20
Electrical supply configuration H .....................................................................................37
21
Electrical supply configuration I ......................................................................................38
22
Flange loading limits ................................................................................................... 42
23
Lubricate the rear bearing (EH250, EH500 and EH500IND pumps only) ........................................ 49
Page ii
© Edwards Limited 2007. All rights reserved.
Edwards and the Edwards logo are trademarks of Edwards Limited.
Page

Advertisement

Table of Contents
loading

Summary of Contents for Edwards EH500

  • Page 1: Table Of Contents

    1.2.4 Hydrokinetic drive ....................... 5 Change the pump oil ....................47 Chemical and ATEX compliant EH pumps ................5 Lubricate the rear-bearing (All EH250 and EH500 model pumps only) ......... 48 1.3.1 Flameproof motors ...................... 5 Overhaul the pump .....................49 1.3.2...
  • Page 2 The hydrocarbon safe area, ATEX compliant and chemical EH pumps use hydrocarbon oils, such as Edwards Ultragrade 20. Versions of the safe area EH pumps for use with PFPE (perfluoropolyether) oils are also available for vacuum systems in which oxygen or other reactive or corrosive gases are pumped.
  • Page 3: General Construction

    An 'X' suffix to the EH booster ATEX classification indicates that there are special conditions for safe use of polytetrafluoroethylene (PTFE) or fluoro-elastomer. the booster. For EH mechanical boosters that have not been sold as part of a Edwards approved ATEX system please give special attention to Section 2.2...
  • Page 4: Hydrokinetic Drive/Gearbox Purge

    Table 2 - Temperature classifications Temperature Classification Critical backing pressure [mbar] T160 If you want to use the EH booster outside the critical backing pressure specified above, please contact Edwards for advice. © Edwards Limited 2007. All rights reserved. Page 9 Page 10 ©...
  • Page 5: Performance

    Electrical data Lubrication data Note: The motors of EH250, EH500 and EH500IND pumps are supplied configured for ‘low voltage’ operation (230 V Note: Edwards Material Safety Data Sheets for the oils and grease specified below are available on request. and lower), the motors of all other pumps are supplied configured for ‘high voltage’ operation (380 V and...
  • Page 6: Noise And Vibration Data

    © Edwards Limited 2007. All rights reserved. Page 15 Page 16 © Edwards Limited 2007. All rights reserved. Edwards and the Edwards logo are trademarks of Edwards Limited. Edwards and the Edwards logo are trademarks of Edwards Limited. A301-51-880 Issue T A301-51-880 Issue T...
  • Page 7 © Edwards Limited 2007. All rights reserved. Page 19 Page 20 © Edwards Limited 2007. All rights reserved. Edwards and the Edwards logo are trademarks of Edwards Limited. Edwards and the Edwards logo are trademarks of Edwards Limited. A301-51-880 Issue T A301-51-880 Issue T...
  • Page 8: Installation

    You must be able to purge with an inert gas when you shut down the pumping system to dilute dangerous gases to safe concentrations. Consult Edwards or your supplier if you are in doubt. If the EH pump is to be fitted in a new system, ensure that all preliminary pipelines have been installed and that a Safety suitable base for the EH pump has been prepared before you start installation.
  • Page 9: Fill The Pump With Oil

    The motor must be correctly configured and you must make the correct electrical connections for your electrical The motors of the EH250, EH500 and EH500IND pumps are supplied configured for ‘low-voltage’ operation (240 V and supply. If you do not, you can damage the motor.
  • Page 10: Connect The Motor Thermistors (Chemical And Atex Compliant Eh Pumps Only)

    © Edwards Limited 2007. All rights reserved. Page 31 Page 32 © Edwards Limited 2007. All rights reserved. Edwards and the Edwards logo are trademarks of Edwards Limited. Edwards and the Edwards logo are trademarks of Edwards Limited. A301-51-880 Issue T A301-51-880 Issue T...
  • Page 11: Check The Direction Of Pump Rotation

    EH pump for two or three seconds, then switch the EH pump off. On all of the EH250, EH500 and EH1200 model pumps, you can use the method above to determine the direction of rotation. Alternatively, the direction of rotation is also indicated by an arrow next to the direction of rotation 1.
  • Page 12: Connect The Hydrokinetic Drive/Gearbox Purge Nitrogen Supply

    The hydrokinetic drive/gearbox purge nitrogen supply is off whenever the chemical or ATEX compliant EH pump is off. Pump-inlet and outlet connections are made with standard ISO flanges, Edwards trapped ‘O’ rings and (on the EH250 pumps only) a Edwards Co-Seal.
  • Page 13: Operation

    Edwards Material Safety Data Sheets for fluorinated 3. Check the hydrokinetic drive/gearbox oil-level. If the oil-level is below the top of the reflector plate, refer to materials used in the EH pump are available on request: contact your supplier or Edwards.
  • Page 14: Change The Pump Oil

    A301-51-880 Issue T Overhaul the pump The EH pump can only be overhauled by Edwards service engineers: contact your supplier or Edwards for advice. Figure 23 - Lubricate the rear bearing (EH250, EH500 and EH500IND pumps only) This page has been intentionally left blank.
  • Page 15: Storage And Disposal

    The spare parts listed in Table 25 are available for the EH1200 pumps. Order spare parts from your nearest Edwards company or distributor. When you order, please state for each part required: Table 25 - EH2600 and EH4200 spare parts...

Table of Contents