Function Description; Device Start-Up And Initialization - WAGO -I/O-SYSTEM 750 Manual

Profinet io advanced fieldbus coupler, 2-port switch, 100 mbit/s, digital, analog and complex signals
Hide thumbs Also See for WAGO-I/O-SYSTEM 750:
Table of Contents

Advertisement

WAGO-I/O-SYSTEM 750
750-375 PROFINET IO advanced Fieldbus Coupler
Pos : 62 /All e Seri en (Allgemei ne Module)/Ü berschriften für alle Serien/F unktions bes chr eibung - Ü berschrift 1 @ 4\mod_1239025975389_21.doc x @ 30003 @ 1 @ 1
7

Function Description

Pos : 63.1 /Serie 750 (WAGO-I/O-SYST EM)/F unktions beschr eibung/Funkti onsbesc hrei bung 750-375 - T eil 1 - (Auflistung des Kapitels) @ 19\mod_1402043779694_21.doc x @ 155328 @ @ 1
This chapter describes the essential functions of the fieldbus coupler.

Device start-up and initialization

Switch port settings
Identification and maintenance data sets (I&M)
Process data structure
Configuration limits
Flexible configuration of digital I/O modules
Variation of physical peripheral layout
Sharing I/O modules in several ARs (Shared Device)
Use of failsafe I/O modules (PROFIsafe V2)
Individual parameterization of I/O modules using iPar-Server
Control of digital and analog output modules by means of PROFIenergy
Firmware Update
Pos : 63.2 /Serie 750 (WAGO-I/O-SYST EM)/F unktions beschr eibung/Funkti onsbesc hrei bung Stations hochl auf- und Initi alisierung 750-375, - 377 - T eil 1.1 @ 15\mod_1370510165464_21.doc x @ 122000 @ 2 @ 1
7.1
Device Start-Up and Initialization
After a restart the fieldbus coupler does several hardware tests, e.g. the check of
memory components. Successfully passed those tests it initializes the internal
communication system K-Bus to identify the arranged I/O modules and to
exchange information with them. This phase is indicated by the I/O LED, which
flashes red at 10 Hz. Subsequent to the successful K-Bus initialization the I/O-
LED changes to green on-state.
The fieldbus coupler then switches to the "Fieldbus Start" state in which it waits
for the connection with the higher-level control system (IO controller) as an IO
device.
If an error occurs during start-up, the I/O LED flashes red and a blink code
indicates the respective error message.
Pos : 63.3.1 /Serie 750 (WAGO-I/O-SYST EM)/F unktions beschr eibung/Betriebss ystem/Initialisi erung (Betriebss ystem Koppl er) - PR OFIN ET @ 13\mod_1353928290758_21.doc x @ 106950 @ @ 1
Manual
Version 1.1.0
Function Description
73

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

750-375750-377Wago-i/o-system 750 series

Table of Contents