Synchronization Line X2B; Activation Of The Self-Holding X2C; Hsp5 Operator Interface X4B - KEB COMBIVERT R6-S Applications Manual

Hide thumbs Also See for COMBIVERT R6-S:
Table of Contents

Advertisement

1.3.1.4 Synchronization line X2B

X2B RJ45 socket for phase synchronization and
temperature sensor
The connection is made with a standard patch cable 1:1 with the socket X2B at the commutation throttle

1.3.1.5 Activation of the self-holding X2C

K1

1.3.1.6 HSP5 Operator interface X4B

X4B
5
4
3
9
8
7
00.58.025-001D
© KEB, 2008-02
1
8
K1
X2C
X2C
25
24
PIN RS485
1
2
2
1
3
6
4
5
6
7
8
9
RS 232 Kabel
part number
length 3 m
COMBIVERT R6-S
Nr.
Name
Function
1
T1
Connection for temperature sensor (Opti-
2
T2
on)
3
U13_syn Synchronization Phase 1 / 3
4
reserved
5
U21_syn Synchronization Phase 2 / 1
6
reserved
7
U32_syn Synchronization Phase 3 / 2
8
reserved
Mains contactor
Activation of the line contactor self-holding
Signal
Meaning
-
-
reserved
-
TxD
Transmission signal RS232
-
RxD
Receive signal RS232
A'
RxD-A
Receive signal A RS485
B'
RxD-B
Receive signal B RS485
-
VP
Voltage supply +5 V (Imax=50 mA)
C/C'
DGND
Data reference potential
A
TxD-A
Transmission signal A RS485
B
TxD-B
Transmission signal B RS485
9 pol. SUB-D socket
PC
Housing (PE)
Hardware
9 pol. SUB-D connector
Operator
Seite 1.3 - 7
1
10

Advertisement

Table of Contents
loading

Table of Contents