Juniper MX2010 Hardware Manual page 607

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

WARNING:
To ensure that all power is off, locate the circuit breaker on the panel board that
services the AC circuit, move the circuit breaker to the OFF position, and tape the
switch handle of the circuit breaker in the OFF position.
WARNING:
dangerous voltages.
CAUTION:
power supply unit, each PDM slot must contain either a PDM or a blank panel. If you
remove a PDM, you must install a replacement PDM or a blank panel shortly after the
removal.
NOTE:
After powering off a PDM, wait at least 60 seconds before turning the circuit breaker
back on.
To remove a three-phase wye AC PDM:
1. Make sure that the voltage across the AC power source cord is 0 V and that there is no chance that
the cord might become active during the removal process.
2. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
3. Remove the ESD grounding strap from the ESD point on the chassis, and attach it to an approved site
ESD grounding point. See instructions for your site.
4. Disconnect the AC power cord (see
Before performing AC power procedures, disconnect all power sources.
Do not touch the power connectors on the PDM. They can contain
To maintain proper cooling and prevent thermal shutdown of the operating
Figure 310 on page
592) from the power source.
591

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents