Juniper MX2010 Hardware Manual page 315

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

NOTE:
We recommend that you use the proper gauge wire in order for the cable clamps
to hold the AC cables. Using smaller gauge wiring results in the cable clamps not tightening
properly.
WARNING:
only.
12. Verify that the power cable connections are correct.
13. Screw the retaining nut onto the AC power cord to secure it to the metal wiring compartment.
14. Reinstall the metal PDM wiring cover, and using a number 2 Phillips (+) screwdriver, tighten the four
captive screws on the metal AC wiring compartment. Apply between 10 lb-in. (1.13 Nm) to 12 lb-in.
(1.35 Nm) of torque to each screw. Do not overtighten the screws.
15. Use the provided plastic cable tie to fasten the AC power cord to the PDM.
16. Verify that the AC power cord does not touch or block access to router components, and that it does
not drape where people could trip on it.
17. Repeat the procedure for the other three-phase wye AC PDMs.
RELATED DOCUMENTATION
MX2000 Three-Phase Wye AC Power Distribution Module Description | 102
MX2000 Three-Phase Delta AC Power Distribution Module Description | 100
MX2000 Three-Phase Delta and Wye AC Power Distribution Module LEDs | 107
Powering On a Three-Phase AC-Powered MX2000 Router | 319
MX2000 AC Power System Electrical Specifications | 173
MX2000 AC Power Cord Specifications | 170
Prevention of Electrostatic Discharge Damage | 794
Power connections must be performed by a licensed electrician
299

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents