Juniper MX2010 Hardware Manual page 312

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

To connect an AC power cord to an AC power source:
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
an approved site ESD grounding point. See the instructions for your site.
2. Switch off the dedicated customer-site circuit breakers. Ensure that the voltage across the AC power
source cable leads is 0 V and that there is no chance that the cable leads might become active during
installation.
3. Detach the ESD grounding strap from the approved site ESD grounding point, and connect the strap
to one of the ESD points on the chassis.
4. Move the power switches on all the power supply module (PSM) faceplates to the off (O) position.
5. Verify that the correct three-phase wye PDMs are installed and secured in the chassis before connecting
power cables.
NOTE:
The power cables must be uninstalled and removed from the three-phase wye
PDM before removal of the PDM from the chassis.
6. Using a number 2 Phillips (+) screwdriver, unscrew the four captive screws located on the either side
of the metal AC wiring compartment (four screws total on each PDM).
7. Remove the metal cover of the metal AC wiring compartment.
8. Unscrew the retaining nut from the AC power cord.
9. Insert the wires of the AC power cord through the hole of the retaining nut and rubber grommet.
10. Insert the wires of the AC power cord through the hole of the metal compartment.
11. Connect the wires to the AC terminal block on the three-phase wye AC PDM (see
Figure 127 on page
297). Loosen the input terminal or grounding point screw, insert each wire into the
grounding point or input terminal, and tighten the screw (see
wire gauge).
Table 81 on page 298
for approved AC
296

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents