Juniper MX2010 Hardware Manual page 330

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

Figure 134: Connecting Power
4. Connect the power cords for the remaining PDMs.
5. Connect the power cable (CBL-PWR-240V-CH) to the DC power source. See
Figure 136: 240 V China Power Cable
1
Negative
2
Ground
6. Switch on the dedicated customer site circuit breaker.
7. On each of the DC power input sources, switch the DC circuit breaker to the center position before
moving it to the ON position.
NOTE:
The circuit breaker may bounce back to the off position if you move the breaker
too quickly.
1
2
3
3
Positive
Figure 136 on page
314.
314