noise filter, which will lead to inverter fault or component damage.
9. When wiring change is required while power is on or inverter is running, inverter operation
must be stopped then wait for over 10 minutes after power is cut off. Check the voltage by
multi-meter then make the wiring change. There is still dangerous high voltage on capacitor
within a period after power is cut.
10. Ground terminal must be well grounded.
▲Since there is leakage current in inverter, in order to avoid electric shock, inverter and
motor must be grounded.
▲Use independent terminal for inverter grounding. DO NOT just use screw on shell or
chassis instead.
▲ It is recommended to adopt thick cable with demanded diameter no smaller then in the
attached form. Grounding wire should be near inverter, and ground wire be as short as
possible.
▲ When the motor is grounded on inverter side, please use one core of the four-core cable
to ground, with the same size to input wire.
2.4.4 Inverter Control Loop Terminal Row
AI1
AI2
A
B
Notes: Different models may have some changes, please in kind prevail!
2.4.5 Control Loop Terminal Explanation
Terminal
Mark
+10V
reference voltage
AI1
AI2
10V
GND COM
GND
AO1 COM
Terminal Name
Analog input
Analog input 1
Analog input 2
X1
X3
X5
X2
X4
X6
Explanation
The resistance of external potentiometer should be
during 4.7KΩ~10KΩ
Input 0-10V, PID setting or feedback
Input 4-20mA, PID setting or feedback
- 18 -
E5 User Manual
PLC
Y2
24V
Y1
COM
TB1
TA1
TC1