Suzuki SY413 Service Manual page 1524

Table of Contents

Advertisement

1. Plug
10. Snap ring
2. O-ring
11. Pump cover
3. Flow control spring
12. Pulley (Shaft)
4. Relief valve
13. Oil seal
5. Suction connector
14. Pump body
6. Side plate
15. Terminal set
16. Blank
7. Vane
8. Rotor
17. Suction connector bolt
9. Cam ring
DISASSEMBLY AND ASSEMBLY POWER
STEERING PUMP
DISASSEMBLY
1) Clean its exterior thoroughly.
2) With aluminum plates placed on vise first, grip pump body with
it.
3) Remove suction connector bolt, suction connector and O-ring
from pump body.
4) Remove power steering pressure switch (terminal set) from
pump body.
5) Remove plug, flow control spring and relief valve (flow control
valve) from pump body.
6) Remove cover bolts, pump cover and O-ring from pump body.
7) Remove snap ring from pump shaft.
8) Remove vanes from rotor.
9) Remove cam ring, rotor, side plate and O-rings from pump
body.
10) Pull out pulley from pump body.
11) Remove oil seal from pump body.
INSPECTION
Pump Body, Cover, Side Plate and Shaft
Check sliding surfaces of each part for wear and damage.
If any defect is found, replace pump assembly.
Cam Ring
Check vane sliding surface of cam ring for wear and damage.
If any defect is found, replace pump assembly.
POWER STEERING (P/S) SYSTEM 3B1-27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sy416Sy418

Table of Contents