Installing A Brocade Mlxe Series-32 Router; Preparing The Installation Site - Brocade Communications Systems NetIron MLXe Series Hardware Installation Manual

Table of Contents

Advertisement

Installing a Brocade MLXe Series-32 router

8.
Attach the cable management comb as shown in the following figure. For cable management instructions, refer to
MLXe Series-32 cable management
FIGURE 59 Attach the cable management comb
NOTE
Repeat these steps for each router you install in the EIA rack.

Installing a Brocade MLXe Series-32 router

This section describes how to install a Brocade MLXe Series-32 router.
NOTE
Illustrations in this chapter may differ slightly from the actual
equipment.

Preparing the installation site

Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a
minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed
within a perforated enclosure, the perforations must cover at least 60 percent of the surface.
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply.
Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not
intended for Outside Plant (OSP) installations.
You will need to use a mechanical lift to move and install the router. Be sure to allow enough working room for the lift.
134
on page 156.
Brocade NetIron MLXe Series Hardware Installation Guide
Brocade
53-1004203-04

Advertisement

Table of Contents
loading

Table of Contents