Installing A Brocade Mlxe Series-16 Router; Preparing The Installation Site; Unpacking A Brocade Mlxe Series-16 Router - Brocade Communications Systems NetIron MLXe Series Hardware Installation Manual

Table of Contents

Advertisement

Installing a Brocade MLXe Series-16 router

Installing a Brocade MLXe Series-16 router

The following sections describe how to install a Brocade MLXe Series-16 router.
NOTE
Illustrations may differ slightly from the actual
equipment.

Preparing the installation site

Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a
minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If you are installing
the router in a perforated enclosure, the perforations must cover at least 60 percent of the surface.
Ensure that the proper power and network cabling is installed at the site. For information about cabling, refer to
in a Brocade MLXe Series-16 router
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply.
Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not
intended for Outside Plant (OSP) installations.

Unpacking a Brocade MLXe Series-16 router

The Brocade MLXe Series-16 router ships with the following items:
Router chassis with switch fabric modules installed in the slots marked SF, and slot blanks installed in all empty module slots.
Four AC or four DC power supplies
Insertion or extraction tool for use with RJ-45 and fiber-optic connectors.
If any of these items are missing, contact the place of purchase.
Remove your Brocade MLXe Series-16 router from the shipping carton. Save the shipping carton and packing materials in case you
need to move or ship the router at a later time.
Lifting guidelines for Brocade MLXe Series-16 routers
DANGER
A fully populated chassis is heavy. TWO OR MORE PEOPLE ARE REQUIRED WHEN LIFTING, HANDLING, OR
MOUNTING THESE DEVICES.
Follow these guidelines for lifting and moving your Brocade MLXe Series-16 router:
Before lifting or moving the router, disconnect all external cables.
Do not attempt to lift a fully configured router by yourself. Use two people to lift the router.
It is recommended that you remove router components before installing the router in a rack.
112
on page 117,and
Attaching a management station
Installing power supplies
on page 171.
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-04

Advertisement

Table of Contents
loading

Table of Contents