Observing The Leds - Brocade Communications Systems NetIron MLXe Series Hardware Installation Manual

Table of Contents

Advertisement

Observing the LEDs

When power is supplied to the router, you can observe the LEDs to verify that the router initialized successfully. The following table
describes the LEDs, the desired state of each LED, possible abnormal states of each LED, and what to do if an LED indicates an
abnormal state.
TABLE 35 Router LED states and actions
LED label
Management module
Active
Pwr
10/100/1000 Ethernet
Port
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-04
Desired state
The Active LED on one of
the installed management
modules should be on.
On
On (green)
Meaning
The module is functioning
as the active management
module.
The module is receiving
power.
A link is established with the
remote port.
Abnormal state
Off
Off
Off
Verifying proper operation
Meaning or action
Neither of the management
modules is managing the
switch fabric and interface
modules. A problem may
have occurred during
initialization. Check your
attached PC or terminal for
possible error messages.
The module is not receiving
power. Check the following:
Make certain that
the module is
installed properly.
For more
information, refer
to the module
installation
section in this
chapter that
applies to your
router model.
If you are using
AC power
supplies, refer to
the AC power
supply LED
information in this
table for more
information.
A link is not established with
the remote port. Check the
following:
Verify that the
connection to the
other router has
been properly
made. Also, make
certain that the
other router is
powered on and
operating
correctly.
Try using a
different cable.
173

Advertisement

Table of Contents
loading

Table of Contents