Brocade Communications Systems NetIron MLXe Series Hardware Installation Manual page 149

Table of Contents

Advertisement

The cable management on this chassis has been removed for clarity to show the installation of the new rack ears and
the installation of the device into the rack. The cable management should remain on the chassis during the assembly
process.
7.
Remove the factory-installed mounting brackets from the router.
8.
Attach the front right and left mounting brackets to the chassis using the 10 8-32 Phillips flat-head screws (refer to the
following figure).
FIGURE 70 Attaching front right and left mounting brackets to the router chassis
9.
Adjust the rails to fit your rack. The rails are telescoping and can accommodate rack depths from 27 through 31 inches.
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-04
Installing a Brocade MLXe Series-32 router
149

Advertisement

Table of Contents
loading

Table of Contents