6.
Install the side duct to the mounting shelf, using the tab and slot features at the base of the duct assembly. Refer to
FIGURE 49 Install side air ducts to the mounting shelf (MLXe-4 and MLXe-8)
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-04
Mounting Brocade MLXe Series-4, -8, or -16 routers in a 4-post EIA rack
Figure
49.
125