Brocade Communications Systems NetIron MLXe Series Hardware Installation Manual page 69

Table of Contents

Advertisement

FIGURE 14 BR-MLX-1GFx24-X and BR-MLX-1GFx24-X-ML fiber interface module front panel
The front panel includes the following features:
Arrow-shaped LEDs in center horizontal strip for all ports. LEDs to the left support the top ports, LEDs to the right (pointing
down) support the bottom ports.
24 1 Gbps fiber ports
The following table describes the port status for the BR-MLX-1GFx24-X and BR-MLX-1GFx24-X fiber module.
TABLE 19 BR-MLX-1GFx24-X and BR-MLX-1GFx24-X fiber module LEDs
Position
Arrow-shaped LEDs in center horizontal strip
between ports. Left LEDs support upper ports.
Right LEDs support lower ports.
For a list of SFP optics supported for the BR-MLX-1GFx24-X and BR-MLX-1GFx24-X interface modules, refer to the latest version of
the Brocade Optics Family Data Sheet.
Power supply requirements for BR-MLX-1GFx24-X and BR-MLX-1GFx24-X-ML interface modules
For power supply requirements for BR-MLX-1GFx24 and BR-MLX-1GFx24-X ML (24-port 1 Gbps) fiber interface modules, refer to
Hardware specifications for Brocade MLXe Series routers
20-port 100/1000 Ethernet interface module
The front panel includes the following features:
LEDs to the left support the top ports, LEDs to the right support the bottom ports
20 100/1000 Ethernet SFP ports
FIGURE 15 20-port 100/1000 Ethernet module front panel
The following table describes the port LED status of the 20-port 100/1000 Ethernet module.
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-04
State
Solid green
Green blinking
Off
on page 271.
Meaning
A link has been established.
The port is transmitting and receiving packets.
No link exists, and the port is not transmitting or
receiving packets.
Router modules
69

Advertisement

Table of Contents
loading

Table of Contents