Siemens SINAMICS G120 Operating Instructions Manual page 8

Low voltage converters chassis devices with cu240b-2 and cu240e-2
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Table of contents
4.3.4
4.3.5
utilizing push-through technology...........................................................................................65
4.3.6
4.4
Connecting the line supply, motor, and inverter components................................................69
4.4.1
TN line system.......................................................................................................................69
4.4.2
TT line system........................................................................................................................71
4.4.3
IT system................................................................................................................................72
4.4.4
Protective conductor..............................................................................................................72
4.4.5
Connecting an inverter with the PM240-2 Power Module......................................................74
4.4.6
Connecting the inverter with the PM230 Power Module........................................................78
4.4.7
Connecting the inverter with the PM240P-2 Power Module...................................................80
4.4.8
Connecting the inverter with the PM250 Power Module........................................................82
4.4.9
4.4.10
Connecting a motor holding brake.........................................................................................85
4.4.10.1
Installing a Brake Relay - PM250 Power Module...................................................................87
4.4.10.2
Mounting and connecting the brake relay..............................................................................88
4.5
Installing Control Unit.............................................................................................................89
4.5.1
Overview of the interfaces......................................................................................................91
4.5.2
Fieldbus interface allocation...................................................................................................92
4.5.3
Terminal strips on CU240B-2 Control Units...........................................................................93
4.5.4
Factory setting of the CU240B-2 interfaces...........................................................................95
4.5.5
Default settings of the CU240B-2 interfaces..........................................................................97
4.5.6
Terminal strips on CU240E-2 Control Units.........................................................................101
4.5.7
Factory setting of the CU240E-2 interfaces.........................................................................104
4.5.8
Default settings of the CU240E-2 interfaces........................................................................106
4.5.9
Safety input of the CU240E-2..............................................................................................116
4.5.10
Wiring the terminal strip.......................................................................................................118
4.5.11
Connecting the temperature contact of the braking resistor................................................120
4.6
Connecting the inverter to the fieldbus.................................................................................121
4.6.1
PROFINET...........................................................................................................................121
4.6.1.1
Communication via PROFINET IO and Ethernet.................................................................121
4.6.1.2
Connecting the PROFINET cable to the inverter.................................................................123
4.6.1.3
What do you have to set for communication via PROFINET?.............................................123
4.6.1.4
Installing GSDML.................................................................................................................124
4.6.2
PROFIBUS...........................................................................................................................125
4.6.2.1
Connecting the PROFIBUS cable to the inverter.................................................................125
4.6.2.2
What do you have to set for communication via PROFIBUS?.............................................126
4.6.2.3
Installing the GSD................................................................................................................127
4.6.2.4
Setting the address..............................................................................................................127
5
Commissioning.........................................................................................................................................129
5.1
Commissioning guidelines...................................................................................................129
5.2
Tools to commission the inverter.........................................................................................130
5.3
Preparing for commissioning................................................................................................131
5.3.1
Collecting motor data...........................................................................................................131
5.3.2
Inverter factory setting..........................................................................................................132
5.4
Quick commissioning using the BOP-2 operator panel........................................................134
5.4.1
Inserting the BOP-2..............................................................................................................134
8
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2017, FW V4.7 SP6, A5E34259001B AD

Advertisement

Table of Contents
loading

Table of Contents