Siemens SINAMICS G120 Operating Instructions Manual page 146

Low voltage converters chassis devices with cu240b-2 and cu240e-2
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
● ROT: Measure the motor data with the motor rotating. The inverter switches off the motor
after the motor data identification has been completed.
● ST RT OP: setting same as STIL ROT.
After the motor data identification, the motor accelerates to the currently set setpoint.
● STILL OP: setting same as STILL.
After the motor data identification, the motor accelerates to the currently set setpoint.
Complete quick commissioning:
Switchover the display using an arrow key: nO → YES
Press the OK key.
You have completed quick commissioning.
146
Converter with the CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2017, FW V4.7 SP6, A5E34259001B AD