Descriptions of functions
10.4 Communication via SINAMICS Link
10.4.2

Topology

Only a line topology with the following structure is permitted for SINAMICS Link.
Figure 10-30 Maximum topology
● The numbers of the various nodes are entered into parameter p8836[0...63] in ascending
● Gaps in the numbering are not permitted.
● The node with the number 1 is automatically the sync master of the communication link.
● When configuring the communication, the NameOfStation (SINAMICSxLINKx001 ...
● For the CBE20 connection, the ports must be used as shown in the diagram above – this
10.4.3

Configuring and commissioning

Commissioning
When commissioning, proceed as follows for the Control Unit:
● On the CU, set parameter p0009 to 1 (unit configuration).
● On the CU, set parameter p8835 to 3 (SINAMICS Link).
● Using p8836, assign node numbers to the nodes (the first CU is always assigned the
● On the CU, set parameter p0009 to 0 (unit configuration).
● Save the changes saved in the RAM in a non-volatile fashion.
● Perform a Power ON (switch-off/switch-on).
358
order.
SINAMICSxLINKx064) and the IP address (169.254.123.001 ... 169.254.123.064) of the
particular node are automatically set up by allocating the node number and cannot be
changed.
is mandatory. This means that Port 2 (P2) of node n is always connected with Port 1 (P1)
of node n+1.
Note: In order that SINAMICS Link can be selected, a memory card with the actual
software must be inserted in the drive.
number 1). Observe the specifications under "Topology". Node number 0 means that
SINAMICS Link is shut down.
SINAMICS DCM Control Module
Operating Instructions, 06.2010, C98130-A7067-A1-02-7619