Figure 11-4
Replacing the backup battery for the cabinet operator panel
Note
The battery must be disposed of in accordance with the manufacturer guidelines and
applicable country-specific laws and directives.
SINAMICS DCM Control Module
Operating Instructions, 06.2010, C98130-A7067-A1-02-7619
NOTICE
The battery must be replaced within one minute to ensure that no AOP settings are lost.
11.2 Replacing the back-up battery in the AOP30 operator panel
Maintenance
479