Transport, unpacking, installation
5.2 Installation
5.2
Installation
Failure to lift the unit properly can lead to physical injury or material damage.
The unit should only be lifted with suitable equipment (work gloves should be used) and by
appropriately qualified personnel.
The user assumes responsibility for installing the SINAMICS DCM Control Module, power
unit, motor, transformer, and other units in accordance with safety regulations (e.g. EN,
DIN, VDE) and all other relevant national or local regulations concerning conductor
dimensioning, protection, grounding, disconnectors, overcurrent protection, and so on.
The unit must be installed in accordance with safety regulations (e.g. EN, DIN, or VDE) as
well as all other applicable national or local regulations. Grounding, conductor
dimensioning, and the relevant short-circuit protection work must be carried out correctly in
order to ensure operational safety.
38
CAUTION
SINAMICS DCM Control Module
Operating Instructions, 06.2010, C98130-A7067-A1-02-7619