Edge Node Configuration Example; Configuring Assistant Edge Node; Configuration Procedure - H3C S3610-28P Operation Manual

S3610 & s5510 series
Table of Contents

Advertisement

Operation Manual – RRPP
H3C S3610&S5510 Series Ethernet Switches
Caution:
The control VLAN configured for an RRPP domain must be a new one.
Control VLAN configuration is required for configuring an RRPP ring.
A Ring ID cannot be applied to more than one RRPP ring in an RRPP domain.
You must first configure the primary ring and then the subring when configuring an
edge node. Moreover, you must remove all subring configurations before deleting
the primary ring configuration of an edge node. However, the RRPP ring enabled
cannot be deleted.
To use the undo rrpp domain command to remove an RRPP domain, you must
ensure the RRPP domain has no RRPP ring.

1.5.2 Edge Node Configuration Example

I. Networking requirements
Specify the device in RRPP domain 1;
Set VLAN 4092 as the control VLAN;
Specify the device as the transit node of primary ring 1 in RRPP domain 1,
Ethernet 1/0/1 as the primary port and Ethernet 1/0/2 as the secondary port;
Specify the device as the edge node of subring 2 in RRPP domain 1, Ethernet
1/0/2 as a common port and Ethernet 1/0/4 as an edge port.
II. Configuration procedure
<Sysname> system-view
[Sysname] rrpp domain 1
[Sysname-rrpp-domain1] control-vlan 4092
[Sysname-rrpp-domain1] ring 1 node-mode transit primary-port ethernet 1/0/1
secondary-port ethernet 1/0/2 level 0
[Sysname-rrpp-domain1] ring 2 node-mode edge common-port ethernet 1/0/2
edge-port ethernet 1/0/4
[Sysname-rrpp-domain1] ring 1 enable
[Sysname-rrpp-domain1] ring 2 enable
[Sysname-rrpp-domain1] quit
[Sysname] rrpp enable

1.6 Configuring Assistant Edge Node

1.6.1 Configuration Procedure

Follow these steps to configure assistant edge node:
1-15
Chapter 1 RRPP Configuration

Advertisement

Table of Contents
loading

Table of Contents