HEIDENHAIN TNC 620 User Manual page 680

Hide thumbs Also See for TNC 620:
Table of Contents

Advertisement

18
Tables and Overviews
18.5 Functions of the TNC 620 and the iTNC 530 compared
Function
Circle programming with polar
coordinates
Tool radius compensation on
circular arc or helix with angular
length = 0
Compensation of tool length in the
position display
SLII Cycles 20 to 24:
Number of definable contour
elements
Define the working plane
Position at end of SL cycle
680
TNC 620
The incremental rotation angle
IPA and the direction of rotation
DR must have the same sign.
Otherwise, an error message will
be issued
The transition between the
adjacent elements of the arc/helix
is generated. Also, the tool axis
motion is executed right before
this transition. If the element is
the first or last element to be
corrected, the next or previous
element is dealt with in the same
way as the first or last element to
be corrected
The values L and DL from the tool
table and the value DL from the T
block are taken into account in the
position display
Max. 16384 blocks in up to 12
subcontours
Tool axis in T block defines the
working plane
With the
posAfterContPocket(no. 201007)
parameter, you can define
whether the end position is
above the last programmed
position, or whether the tool
moves to clearance height in
the tool axis
If the tool moves to clearance
height in the tool axis,
both coordinates must be
programmed with the first
traverse movement
HEIDENHAIN | TNC 620 | ISO Programming User's Manual | 9/2016
iTNC 530
The algebraic sign of the direction
of rotation is used if the sign
defined for DR differs from the one
defined for IPA
The equidistant line of the arc/
helix is used for generating the
tool path
The values L and DL from the tool
table are taken into account in the
position display
Max. 8192 contour elements
in up to 12 subcontours, no
restrictions for subcontour
The axes of the first positioning
block in the first subcontour
define the working plane
With MP7420, you can define
whether the end position is
above the last programmed
position, or whether the tool
moves only to clearance height
in the tool axis
If the tool moves to clearance
height in the tool axis,
one coordinate must be
programmed with the first
traverse movement

Advertisement

Table of Contents
loading

Table of Contents