Installation Procedure - Ricoh B003 Service Manual

Hide thumbs Also See for B003:
Table of Contents

Advertisement

BRIDGE UNIT FOR MAILBOX (G912)

1.2.2 INSTALLATION PROCEDURE

[A]
!
CAUTION
Unplug the main machines power cord before starting the following
procedure.
NOTE: 1) The bridge unit for the mailbox must be installed when the 3000 sheet
finisher (A697) will be installed.
2) The 3000 sheet finisher (A697) can be installed only on the
A232/B003/B004 and A229 machines.
1. Unpack the bridge unit and remove the shipping retainers [A].
NOTE: Do not remove the protective sheet [B] at this time.
2. Remove the mailbox if it has been previously installed.
3. Remove the rear cover [C] of the mailbox (8 screws).
4. Remove the proof tray unit [D] (6 screws, 1 connector).
5. Remove the cover [E].
B003/B004/B006/B007
CÓPIA NÃO CONTROLADA
G912I506.WMF
[B]
15-16
CÓPIA NÃO CONTROLADA
[A]
[D]
[E]
[C]
G909I508.WMF
SM

Advertisement

Table of Contents
loading

This manual is also suitable for:

B004B006B007

Table of Contents