12 June 1987
6. Remove the tension
7. Remove the screws
When mounting the new belt, position the drive shaft bin pulleys [C] so that
the flat surface of each pulley shaft is oriented the same as it was prior to
removing the belt.
8. Replace the bin drive belt [D].
spring [A].
from the tension plate [B].