Installation Of Drive Pulley And Flywheel; Installation Of Air Compressor; Installation Of Power Unit - TOHATSU MD 70-90C2 Service Manual

Table of Contents

Advertisement

Power Unit
41) Installation of Drive Pulley and
Flywheel
1.
Attach key, flywheel and drive pulley to crank shaft, and
tighten the nut to specified torque.
Flywheel Puller Kit :
P/N. 3T1-72211-0
Drive Pulley :
260 N · m (190 lb · ft) [26 kgf · m]
Degrease tapered areas of crank shaft and
flywheel before installing them.

42) Installation of Air Compressor

Refer to "Removing and Installation of Air Compressor" in
Chapter 4.

43) Installation of Power Unit

1.
Attach O ring coated with two stroke engine oil to crank
case head.
2.
Attach crank case head to cylinder ass'y taking care of the
orientation.
Install crank case head so that the mark "F" is at
front side (crank case side) of engine.
2st OIL
2st
5-52
2st
2st OIL
.
TLDI 75/90C2 2010

Advertisement

Table of Contents
loading

Table of Contents