TOHATSU MD 70-90C2 Service Manual page 345

Table of Contents

Advertisement

Electrical Wiring Assembling Instruction Diagram -1
Water temp. sensor
Air injector
Attaching
ground lead
ix cord ass'y to air rail by
using stay and band.
ix 2 oil hoses and cord assÕy to crank case by using
stay and band. Be careful that oil hose is not squeezed.
Oil pump
Bind hoses from oil pump
using band.
ix cord ass'y to oil pump by
Attach ground lead
using stay and band.
Air injector
Water temp. sensor
Cord ass'y
Pass cord assÕy through
crank case hole and
pull out from oil tank side.
Pass oil hose
through inside of stay.
25
TPS 2
Be careful when
assembling
(Connector Color :
Blue)
TLDI 75/90C2 2010
ix cord ass'y to crankcase by
using stay and band.
Pass recirculation hose
and oil hose through inside of stay.
Pass cord assÕy through back of TPS,
and connect with TPS connector.
TPS 1
Be careful when assembling
(Connector Color : Gray)
ECU
11-7

Advertisement

Table of Contents
loading

Table of Contents