Assembly Of Ptt Unit - TOHATSU MD 70-90C2 Service Manual

Table of Contents

Advertisement

21) Assembly of PTT Unit

Put recommended PTT fluid into the unit through hole a.
1.
Recommended PTT Fluid:
OIL
ATF DEXRON
682 cm
3
(23.0 floz.)
Push free piston 1 into tilt cylinder unit fully to the bottom.
2.
Fill with PTT fluid from b, c, and d to a proper level.
3.
4.
Install trim piston ass'y to trim cylinder, and tighten trim
rod guide 2 to specified torque.
· When installing, check that trim rods are
fully extended.
· After installing trim piston ass'y, do not
push trim rod. Doing so will cause fluid
to spurt.
Trim Rod Guide 2 :
80 N · m (58 lb · ft) [8.0 kgf · m]
Trim Rod Guide Wrench 3 :
P/N. 3B7-72792-0
TLDI 75/90C2 2010
III
CAUTION
a
b
d
2
1
7
c
3
7-37

Advertisement

Table of Contents
loading

Table of Contents