TOHATSU MD 70-90C2 Service Manual page 215

Table of Contents

Advertisement

Attach propeller and tighten propeller nut 0 to specified
7.
torque.
· Before removing or installing propeller, be
sure to disconnect battery cables from
battery and remove stop switch lock
plate.
· When removing or installing propeller, do
not handle propeller with bare hands.
· Put a piece of wooden block between
anti-ventilation plate and propeller to
prevent rotation of propeller when
removing or installing propeller.
Propeller Nut 0 :
12N · m (9 lb · ft) [1.2kgf · m]
Attach split pin q.
8.
If propeller shaft pin hole and propeller nut
pin groove do not align, additionally tighten
the nut until they align.
9.
Fill gear case with gear oil to specified level.
Refer to "Replacement of Gear Oil" in Chapter 3.
Perform "Inspection of Gear Case (Air Leakage)"
in Chapter 3 if necessary.
TLDI 75/90C2 2010
CAUTION
CAUTION
OBM
OBM
OBM
OBM
2 Nám (9 lbáft) [ .2 kgfám]
q Split Pin
Do not reuse.
3
1 2
6
6-45

Advertisement

Table of Contents
loading

Table of Contents