Installation Of Fuel System; Installation Of Cord Ass'y And Electrical Parts; Installation Of Starter Motor; Installation Of Alternator - TOHATSU MD 70-90C2 Service Manual

Table of Contents

Advertisement

37) Installation of Fuel System

Refer to "Removing and Installation of Fuel System" in
Chapter 4.
38) Installation of Cord Ass'y and
Electrical Parts
Reverse cord ass'y removing procedure described in
"Removing Cord Ass'y" in Chapter 5.

39) Installation of Starter Motor

1.
Secure starter motor mounting band by using bolts (M10,
2 pcs.) on the upper surface of the motor, and then, install
starter motor to bracket.
Connect grounding cord to air chamber.

40) Installation of Alternator

1.
Tighten coil bracket securing bolts to specified torque.
Coil Bracket bolts : 1
6 N · m (4 lb · ft) [0.6 kgf · m]
2.
tighten alternator securing bolts to specified torque.
Alternator Securing Bolts :
6 N · m (4 lb · ft) [0.6 kgf · m]
3.
Install other parts by reversing removing procedure.
TLDI 75/90C2 2010
5
5-51

Advertisement

Table of Contents
loading

Table of Contents