TOHATSU MD 70-90C2 Service Manual page 346

Table of Contents

Advertisement

Electrical Wiring Assembling Instruction Diagram -2
PTT solenoid switch A
PTT solenoid switch B
Bind PTT relay cords
and connectors for optional
equipment by using band.
Starter solenoid switch
Air chamber grounding wire boss.
Attach cord assÕy for grounding
air chamber individually.
(Center two bosses are
secured together.)
Starter motor
Oil level sensor
1-9 )
Cramp, 6.5-47.5P
L
L
- -
+
+
Use stay to fix FFP connector.
Fuse box
Flywheel magneto
Alternator
CPS (Crank position sensor)
1-9 )
FFP (Fuel feed pump)
CPS connector
Vapor separator
Water temp.sensor
Secure grounding wire of cord assÕy
by using attaching bolt located below ignition coil #1.
Attach ground lead.
Fix high pressure fuel hose and
vapor separator breather hose
by using band.
Secure grounding wire of cord assÕy
by using attaching bolt located below
ignition coil #1.
Ignition coil
Attach ground cord
Rectifier comp.
of rectifier.
TLDI 75/90C2 2010
PTT solenoid switch A
PTT solenoid switch B
Spark plug
Attach ground lead of
cord ass'y.
Pass PTT wires through gap
between main harness
and air chamber.
Fuel injector
Fuel injector
Fix cord ass'y to air rail by
using stay and band.
11-8

Advertisement

Table of Contents
loading

Table of Contents